Skip to Main Content
Fixers in Ireland
Start typing to search...
Brow Head - filming location in Ireland

SCENE 01 / POWER DISTRIBUTION SYSTEMS

Power Distribution Systems

Safe, reliable on-set power for film and TV production in Ireland.

Scroll

Here is how this works in practice. Power distribution systems safely route electrical today's from power packs or mains sources to lighting, camera, and production gear across a set. Pro distro boxes, cable runs, and breaker panels make sure balanced loads, proper grounding, and safe power delivery to each department.

Here is the short of it. We give power distribution systems configured for your production's electrical needs and set layout. Our team sets up with your gaffer and best boy to make sure the right capacity, cable lengths, and safety gear are in place for each location on your schedule.

Capabilities

Complete Power Solutions

From silent generators to comprehensive distribution systems, we provide the electrical infrastructure your production needs to run safely and reliably.

01

Generator Systems

  • Super-silent generators
  • Tow plant units
  • Multi-gen coordination
  • Battery backup systems
  • Hybrid power solutions

Primary Power

02

Distribution Equipment

  • Main distro boxes
  • Sub-distribution units
  • Lunchboxes & quads
  • Stage pin systems
  • European/US adapters

Safe Distribution

03

Cable Systems

  • Feeder cable runs
  • Extension cables
  • Cable management
  • Ramps & protection
  • Connector systems

Complete Runs

04

Load Management

  • Load calculations
  • Circuit protection
  • Power monitoring
  • Phase balancing
  • Safety systems

Safe Operation

On Location

Honda EU2200i and EU7000is silent generators, Wacker Neuson 50/150 kVA tow-behind, distro boxes, and feeder cables prepped through Filmgear Ireland, TVM, and cross-border London

Here is how this works in practice. Power distribution in Ireland routes through Filmgear Ireland Dublin as the dedicated electrical and lighting house (the deepest Wacker Neuson 50, 100, and 150 kVA tow-behind power packs inventory plus full Multiquip Whisperwatt MQ-Power range used across Banshees of Inisherin. Foundation Apple TV+, and Vikings Ashford). TVM Ireland Dublin (cross-discipline electrical cage stocking Honda EU2200i and EU7000is silent portable power packs for handheld camera-cart power).

Here is the short of it. Pyramid Camera Dublin (sub-distribution, lunchbox, and quad-box stock for Normal People HBO and The Quiet Girl 2022 Oscar-nominated), and Hammer Hill Studios Belfast (Game of Thrones eight-season distro and feeder cable inventory through Titanic Studios). We supply complete distribution chains from primary power packs through Bates connectors, Socapex feeder cable, 32A and 63A CEEform, and full RCD-covered lunchbox stage-pin distribution. Ireland 230V/50Hz European voltage runs UK plug-and-play. US 120V gear needs step-down transformers set up through Filmgear and TVM.

Here is the breakdown. Atlantic maritime climate weatherproofing dictates IP-rated distro housings, weatherproof feeder cable runs with cable ramps, and silent-running power packs placement for the wet Atlantic frontal weather October through March across the Wild Atlantic Way, Cliffs of Moher, Aran Islands, and Donegal Slieve League. Heritage zone permits at Skellig Michael UNESCO, Giant's Causeway UNESCO, Newgrange, and Brú na Bóinne dictate silent power packs positioning (Honda EU7000is and Multiquip Whisperwatt below 65 dB at 7m). Pre-OK'd cable runs with no soil disturbance, and OPW or National Monuments sign-off on staging.

Here is what that looks like on the ground. When extra 150 kVA or larger power packs aren't held in Dublin we cross-border to ARRI Rental London or Pinewood London under the Common Travel Area frictionless border (no carnet for UK gear). All cable runs are PAT-tested and RCD-protected to Irish IS 10101 electrical rules, with licensed Irish electricians on each distro tie-in.

FAQ

Power Distribution Expertise

What generator sizes do you provide?

We supply power packs from 20kVA to 500kVA including super-silent units for sound-sensitive shoots. Multi-power packs setups for larger power needs. Battery hybrid systems and tow plant units for many location needs.

How do you calculate power requirements?

We perform detailed load calculations based on your lighting package, camera and DIT needs, video village, and all other electrical needs. We factor in startup loads and give appropriate headroom for safe, reliable operation.

Can you provide power at historic locations?

Here is the breakdown. Yes, we specialize in powering shoots at Ireland's historic locations including historic estates, churches, and covered sites. We set up with venue needs, give appropriate cabling without damage, and make sure compliance with preservation guidelines.

Do you handle tie-ins to venue power?

We set up tie-ins to venue electrical systems where appropriate, working with licensed Irish electricians and venue tech staff. We check ready power, arrange short-term connections, and make sure safe disconnection after your shoot.

What about power for remote locations?

For remote exteriors without mains power, we give complete power packs solutions including fuel management, noise mitigation, and multi-day operation. We plan logistics to make sure uninterrupted power across your shoot.

How do you ensure electrical safety on set?

All gear is PAT tested and well rated. We use RCD protection across, employ licensed electricians, and follow Irish electrical safety rules. Detailed records and safety briefings make sure crew awareness.

Productions in Ireland that need this often pair it with Power Solutions for full coverage. Most projects also draw on Grip Equipment and Portable Power Solutions.

On Set

Need Production Power?

Tell us about your production and we'll design a safe, reliable power solution.